General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Drilling and blasting |
Location
Location: |
Vif, Isère (38), Auvergne-Rhône-Alpes, France |
---|---|
For: |
|
Part of: | |
Coordinates: | 45° 2' 58.73" N 5° 41' 6.44" E |
Coordinates: | 45° 3' 16.45" N 5° 41' 10.90" E |
Technical Information
Dimensions
length | 595 m | |
clear interior profile | 8.50 m x 4.50 m | |
tunnel section area | 87.5 m² | |
length of excavated part | 500 m | |
number of tubes | 2 |
Participants
Owner
Client
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- L'évolution des plans de tir des tunnels d'Uriol et du petit Brion. In: Travaux, n. 757 (October 1999), pp. 46-49. (1999):
- Les tunnels d'Uriol et du Petit Brion. Les travaux de génie civil. In: Travaux, n. 757 (October 1999), pp. 43-45. (1999):
- About this
data sheet - Structure-ID
20008313 - Published on:
17/02/2003 - Last updated on:
28/05/2021