• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Tunnel de Pech Brunet

General Information

Completion: 1998
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
Address: A20
For:
  • Autoroute A20
Part of:
Coordinates: 44° 15' 4.00" N    1° 30' 37.00" E
Show coordinates on a map

Technical Information

Dimensions

tunnel section area 155 m²
tube 1 tunnel length 246 m
tube 2 length 206 m

Cost

cost of construction (incl. taxes) French Franc 82 000 000

Chronology

19 January 1998

Opening of first tube.

21 February 1998

Opening of second tube after a total construction period of 17 months.

Advertisement

Participants

Owner
Client
Architecture
Geotechnical engineering
Checking engineering
Co-contractor
Earthworks

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007942
  • Date created
    31/01/2003
  • Last Update
    29/07/2014