0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2021
Status: in use

Project Type

Location

Location: , , ,
Part of:
Coordinates: 42° 2' 37.77" N    6° 55' 23.55" W
Show coordinates on a map

Technical Information

Dimensions

track gauge 1 435 mm
Northern bridge
length 315 m
number of tracks 1
abutments number 2
Southern bridge
length 324 m
number of tracks 1
abutments number 2

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20089547
  • Published on:
    25/09/2024
  • Last updated on:
    25/09/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine