General Information
Name in local language: | Tunnel Trimberg |
---|---|
Beginning of works: | 19 January 2016 |
Completion: | 2024 |
Status: | under construction |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Wehretal, Werra-Meißner-Kreis, Hesse, Germany |
---|---|
Part of: | |
Coordinates: | 51° 8' 25.70" N 9° 57' 46.49" E |
Coordinates: | 51° 8' 45.43" N 9° 58' 35.70" E |
Technical Information
Dimensions
number of tubes | 2 | |
interior lining | thickness | 0.50 - 0.60 m |
northern tube | ||
---|---|---|
length | 600.41 m | |
roadway / carriageway width | 11.00 m | |
southern tube | ||
length | 570.52 m | |
roadway / carriageway width | 7.50 - 11.00 m |
Quantities
concrete volume | 36 000 m³ | |
reinforcing steel | 3 200 t | |
reinforcing steel | 5 300 t | |
volume of extracted material | 134 250 m³ | |
shotcrete | 145 500 m² |
Cost
cost of construction | Euro 55 000 000 |
Materials
interior lining |
reinforced concrete
|
---|
Participants
Owner
Client
Design
Structural engineering
Architectural consulting
- Friedbert Kind-Barkauskas (architectural consultant)
Checking engineering
- Manfred Keuser (checking engineer)
Co-contractor
Reinforcing steel
Formwork & shoring
Construction management
Site supervision
Relevant Web Sites
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2023. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2023, pp. 145-162.
- About this
data sheet - Structure-ID
20076432 - Published on:
30/11/2018 - Last updated on:
04/06/2024