0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Tunnel Trimberg
Beginning of works: 19 January 2016
Completion: 2024
Status: under construction

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
Part of:
Coordinates: 51° 8' 25.70" N    9° 57' 46.49" E
Coordinates: 51° 8' 45.43" N    9° 58' 35.70" E
Show coordinates on a map

Technical Information

Dimensions

number of tubes 2
interior lining thickness 0.50 - 0.60 m
northern tube
length 600.41 m
roadway / carriageway width 11.00 m
southern tube
length 570.52 m
roadway / carriageway width 7.50 - 11.00 m

Quantities

concrete volume 36 000 m³
reinforcing steel 3 200 t
reinforcing steel 5 300 t
volume of extracted material 134 250 m³
shotcrete 145 500 m²

Cost

cost of construction Euro 55 000 000

Materials

interior lining reinforced concrete

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20076432
  • Published on:
    30/11/2018
  • Last updated on:
    04/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine