General Information
Other name(s): | Talbrücke Triebischtal |
---|---|
Beginning of works: | 1996 |
Completion: | 1999 |
Duration of works: | 35 months |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Triebischtal, Meißen (Kreis), Saxony, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 51° 3' 38.31" N 13° 24' 41.53" E |
Technical Information
Dimensions
width | 37.25 m | |
bridge surface | 15 850 m² | |
height above valley floor or water | max. 52 m | |
deck | deck depth | 4.80 m |
Northern bridge | ||
---|---|---|
total length | 424 m | |
span lengths | 61 m - 72 m - 2 x 84 m - 72 m - 51 m | |
number of spans | 6 | |
Southern bridge | ||
total length | 427 m | |
span lengths | 51 m - 72 m - 2 x 84 m - 72 m - 64 m | |
number of spans | 6 |
Quantities
prestressing steel | 650 t | |
deck | concrete volume | 12 810 m³ |
reinforcing steel | 1 550 t | |
substructure | concrete volume | 11 650 m³ |
reinforcing steel | 1 220 t |
Cost
construction cost (without tax) | German Mark 28 900 000 | |
cost of construction per m² | German Mark 1 825 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Architectural consulting
Checking engineering
- H.-D. Eisert (checking engineer)
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 83-88.
- About this
data sheet - Structure-ID
20000965 - Published on:
20/09/2000 - Last updated on:
14/02/2016