0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Werrabrücke Treffurt
Beginning of works: 1996
Completion: 27 June 1998
Duration of works: 22 months
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Werra River
Carries:
  • Bundesstrasse B 250
Near: Treffurt Flood Channel Bridge (1998)
Coordinates: 51° 8' 3.50" N    10° 14' 14.04" E
Show coordinates on a map

Technical Information

Dimensions

total length 83.0 m
span lengths 27.369 m + 33.292 m + 22.346 m
number of spans 1
bridge surface 1 074 m²
deck deck width 12.50 - 15.75 m

Cost

cost of construction German Mark 4 000 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Chronology

27 June 1998

Opening ceremony.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001176
  • Published on:
    17/12/2000
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine