0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Tranchée couverte de la Beuchille

General Information

Beginning of works: 2000
Completion: 2003
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method

Location

Location: , ,
Address: A16
For:
  • A16 Motorway [Switzerland]
Part of:
Coordinates: 47° 21' 7.47" N    7° 21' 22.38" E
Coordinates: 47° 21' 5.38" N    7° 20' 40.62" E
Show coordinates on a map

Technical Information

Dimensions

northern tube length 890 m
southern tube length 890 m

Cost

cost of construction Swiss Franc 36 000 000

Chronology

30 September 2005

Opened to traffic

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Merzagora, Eugenio A. (2005): La Transjurane. In: Strade e Autostrade, v. 9, n. 53 (September 2005), pp. 34-51.
  • About this
    data sheet
  • Structure-ID
    20011743
  • Published on:
    08/04/2004
  • Last updated on:
    31/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine