General Information
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Toulon, Var (83), Provence-Alpes-Côte d'Azur, France |
---|---|
Address: | A50 |
Next to: |
Toulon Road Tunnel (2002)
|
Coordinates: | 43° 7' 37.28" N 5° 54' 57.59" E |
Coordinates: | 43° 7' 12.64" N 5° 56' 57.53" E |
Technical Information
Dimensions
total length | 3 395 m | |
length of bored tunnels | 1 818 m |
Cost
cost of construction | Euro 292 000 000 |
Participants
Owner
Client
Technical advisor to the owner
Co-contractor
Relevant Web Sites
Relevant Publications
- Un creusement sous haute surveillance. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5457 (June 2008), pp. 78. (2008):
- Deuxième tube de la traversée souterraine de Toulon. Presented at: AFTES - Journées techniques, Monaco, 2008, pp. 117-122. (2008):
- Toulon. Le 2e tube du tunnel en chantier. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5387 (23 February 2007), pp. 42. (2007):
- Traversée souterraine de Toulon. Le second tube pose ses bases. In: Chantiers de France, n. 402 (July 2007), pp. 34-41. (2007):
- Traversée souterraine de Toulon. Trois fraises pour forer le deuxième tube. In: Chantiers de France, n. 411 (June 2008), pp. 40-41. (2008):
- About this
data sheet - Structure-ID
20024945 - Published on:
09/11/2006 - Last updated on:
25/08/2022