General Information
Completion: | 2002 |
---|---|
Status: | in use |
Project Type
Structure: |
Two-span extradosed bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
total length | 160.00 m | |
span lengths | 2 x 80 m | |
number of spans | 2 | |
deck | deck depth | 2.40 - 3.80 m |
deck width | 27.00 m | |
pylon | pylon height (above deck) | 30.25 m |
pylon height (above ground) | 45.00 m |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20080129 - Published on:
19/09/2020 - Last updated on:
19/09/2020