General Information
Completion: | 2019 |
---|---|
Status: | in use |
Project Type
Support conditions: |
for registered users |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Deck truss bridge |
Material: |
Steel bridge |
Structure: |
Continuous truss bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: Bicycle and pedestrian bridge lower deck: Pipeline bridge |
Location
Location: |
Auckland, Auckland, New Zealand |
---|---|
Coordinates: | 36° 43' 39.99" S 174° 42' 53.77" E |
Technical Information
Dimensions
total length | 104 m | |
span lengths | 22 m - 54 m - 22 m | |
number of spans | 3 | |
crossing angle | 35° |
Materials
piers |
steel
|
---|---|
truss |
steel
|
Participants
Architecture
- Wells Architects Planners
- Graham Tipene (artist)
Structural design
Contractor
Steel construction
Relevant Web Sites
Relevant Publications
- (2022): Tirohanga Whanui Footbridge, Auckland, NZ. Incorporation of Maori 'Korero' Cultural Narratives. Presented at: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.
- About this
data sheet - Structure-ID
20083947 - Published on:
27/10/2022 - Last updated on:
27/10/2022