0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1917
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Hinterrhein
Coordinates: 46° 42' 6.70" N    9° 26' 48.92" E
Show coordinates on a map

Technical Information

Materials

cables steel wire
deck timber
pylons timber

Participants

Initial construction (1917)
Design
Rehabilitation (2020)
Structural engineering

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20083759
  • Published on:
    21/09/2022
  • Last updated on:
    22/09/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine