General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Construction method: |
Movable Scaffolding System |
Material: |
Prestressed concrete bridge |
Location
Location: |
Niedernhausen, Rheingau-Taunus-Kreis, Hesse, Germany |
---|---|
Part of: | |
Next to: |
Theiss Viaduct (1976)
|
Coordinates: | 50° 9' 24.34" N 8° 18' 21.53" E |
Technical Information
Dimensions
total length | 484 m | |
span lengths | 43.0 m - 9 x 44 m - 43 m | |
number of spans | 11 |
Quantities
concrete volume | 14 000 m³ | |
prestressing steel | 280 t | |
reinforcing steel | 1 500 t |
Materials
deck |
prestressed concrete
|
---|
Participants
Construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke der Neubaustrecke Köln-Rhein/Main. In: Eisenbahntechnische Rundschau ( 2000), pp. 7-12. (2000):