0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Textimasteg
Beginning of works: 14 July 2005
Completion: 2006
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Weisse Elster River
Part of:
Replaces: Textima Footbridge (1967)
Coordinates: 50° 52' 37.22" N    12° 4' 9.82" E
Show coordinates on a map

Technical Information

Dimensions

length 44 m
pylons height 11.60 m

Materials

pylons steel
abutments reinforced concrete
girders steel
deck flooring wood

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20024836
  • Published on:
    07/11/2006
  • Last updated on:
    03/08/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine