General Information
Project Type
Function / usage: |
Wildlife crossing |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Rigid frame bridge |
Location
Location: |
Teupitz, Dahme-Spreewald, Brandenburg, Germany |
---|---|
Part of: | |
Crosses: |
A 13 Motorway (Germany)
|
Coordinates: | 52° 6' 33.14" N 13° 38' 47.16" E |
Technical Information
Dimensions
span | 46 m | |
deck width | 59.50 - 62.95 m | |
bridge surface | 2 765 m² | |
piles | diameter | 1.20 m |
Quantities
piles | total length of piles | 900 m |
substructure | concrete volume | 3 750 m³ |
reinforcing steel | 820 t | |
superstructure | structural steel | 580 t |
concrete volume | 790 m³ | |
superstructure | ||
---|---|---|
reinforcing steel | 195.5 t |
Design Loads
design code(s) | DIN FB 101 |
Cost
cost of construction | Euro 4 260 000 |
Materials
deck slab |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Design
Erection engineering
Soil investigation report
Checking engineering
- Karsten Geißler (checking engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2013. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2014, pp. 53-64.
- Grünbrücken als Verbundkonstruktion. In: Bautechnik, v. 90, n. 2 (February 2013), pp. 87-90. (2013):
- About this
data sheet - Structure-ID
20066879 - Published on:
27/02/2015 - Last updated on:
05/02/2016