General Information
Project Type
Structure: |
Half-through arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-concrete hybrid bridge Structurae Plus/Pro - Subscribe Now! |
Construction method: |
arches: Cantilever construction using temporary cable-stays deck of approach viaduct: Balanced cantilever method |
Awards and Distinctions
2018 |
for registered users |
---|
Location
Location: |
Amakusa, Kumamoto, Japan Uto, Kumamoto, Japan |
---|---|
Next to: |
Tenmon Bridge (1966)
|
Coordinates: | 32° 36' 43.41" N 130° 27' 32.19" E |
Technical Information
Dimensions
total length | 465.00 m | |
span lengths | 51.00 m - 348.00 m - 56.00 m | |
number of spans | 3 | |
arches | arch span | 348.00 m |
Materials
piers |
reinforced concrete
|
---|---|
deck of main span |
steel
|
arches |
steel
|
deck of approach viaduct |
prestressed concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
- About this
data sheet - Structure-ID
20080040 - Published on:
08/09/2020 - Last updated on:
08/09/2020