General Information
Name in local language: | Acueducto de Tempul |
---|---|
Completion: | 1926 |
Status: | in use |
Project Type
Structure: |
Three-span cable-stayed bridge |
---|---|
Function / usage: |
Aqueduct bridge |
Material: |
Reinforced concrete bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Jerez de la Frontera, Cádiz, Andalusia, Spain |
---|---|
Crosses: |
|
Coordinates: | 36° 38' 55.49" N 5° 55' 49.42" W |
Technical Information
Dimensions
total length | ca. 280 m | |
main bridge | ||
---|---|---|
main span | 60.40 m | |
length of side spans | 2 x 20.10 m |
Materials
deck |
reinforced concrete
|
---|---|
pylons |
reinforced concrete
|
Participants
Design
- Eduardo Torroja (designer)
Relevant Web Sites
Relevant Publications
- (1962): Acueducto de Tempul. In: Informes de la Construcción, v. 14, n. 137 ( 1962), pp. 135-140.
- Analysis of Eduardo Torroja's Tempul Aqueduct an important precursor of modern cable-stayed bridges, extradosed bridges and prestressed concrete. In: Engineering Structures, v. 150 (November 2017), pp. 955-968. (2017):
- Bridge engineering. A global perspective. Thomas Telford, London (United Kingdom), ISBN 9780727732156, pp. 646. (2003):
- Cable-Stayed Bridges. Theory and design. Crosby Lockwood Staples, London (United Kingdom), pp. 386. (1977):
- Eduardo Torroja. Ingeniero - Engineer. Ediciones Pronaos, Madrid (Spain), pp. 204-209. (1999):
- About this
data sheet - Structure-ID
20001055 - Published on:
04/10/2000 - Last updated on:
31/01/2023