0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: July 2008
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , ,
Address: A2
Part of:
Coordinates: 40° 36' 17.49" N    15° 18' 3.73" E
Coordinates: 40° 35' 55.58" N    15° 18' 47.53" E
Show coordinates on a map

Technical Information

Dimensions

eastern tube length 944 m
western tube length 1 259 m

Chronology

15 December 2005

Eastern tube (northbound) breakthrough

6 June 2006

Western tube (southbound) breakthrough

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20049983
  • Published on:
    12/12/2009
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine