General Information
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Gruibingen, Göppingen (Kreis), Baden-Württemberg, Germany |
---|---|
Carried: |
|
Part of: | |
Replaced by: |
Talbrücke über die Franzosenschlucht
|
Coordinates: | 48° 36' 56.03" N 9° 36' 3.91" E |
Technical Information
Materials
deck |
reinforced concrete
|
---|
Participants
Engineering
- Karl Wilhelm Schaechterle (engineer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20006238 - Published on:
15/10/2002 - Last updated on:
05/02/2016