General Information
Other name(s): | Triebischseitentalbrücke |
---|---|
Beginning of works: | June 1996 |
Completion: | 1999 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Girder bridge |
Construction method: |
Incremental launching |
Location
Location: |
Triebischtal, Meißen (Kreis), Saxony, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 51° 3' 30.30" N 13° 25' 42.95" E |
Technical Information
Dimensions
total length | 330 m | |
span lengths | 40 m - 2 x 48 m - 58 m - 2 x 48 m - 40 m | |
number of spans | 7 | |
height above valley floor or water | 43 m | |
girder depth | 3.58 m |
Cost
cost of construction | German Mark 21 500 000 |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20009921 - Published on:
08/08/2003 - Last updated on:
05/02/2016