General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Movable Scaffolding System |
Material: |
Prestressed concrete bridge |
Location
Location: |
Meschede, Hochsauerlandkreis, North Rhine-Westphalia, Germany |
---|---|
Part of: | |
Coordinates: | 51° 22' 16.90" N 8° 9' 26.99" E |
Technical Information
Dimensions
total length | 378.50 m | |
span lengths | 26.75 m - 9 x 36.00 m - 27.75 m | |
number of spans | 11 | |
deck | deck depth | 3.00 m |
deck width | 14.25 m - 14.35 m |
Cost
cost of construction | German Mark 19 200 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
substructure |
reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Checking engineering
- Eibl + Partner
- Josef Eibl (checking engineer)
Contractor
Prestressing
Relevant Web Sites
Relevant Publications
- Talbrücke Rümmecke: Vorspannung durch externe Spannglieder bei Bau auf Vorschubrüstung. In: Beton- und Stahlbetonbau, v. 94, n. 7 (July 1999), pp. 295-305. (1999):
- About this
data sheet - Structure-ID
20000966 - Published on:
20/09/2000 - Last updated on:
05/02/2016