General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Double T-section girder bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Prestressed concrete bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Schleusingen, Hildburghausen (Kreis), Thuringia, Germany |
---|---|
Part of: | |
Coordinates: | 50° 32' 33.48" N 10° 44' 20.96" E |
Technical Information
Dimensions
total length | 146 m | |
span lengths | 32.75 m - 2 x 40.75 m - 32.75 m | |
number of spans | 4 | |
bridge surface | 4 190 m² | |
height above valley floor or water | ca. 28 m | |
girder depth | 2.30 m | |
total width | 28.50 m |
Quantities
concrete volume | 6 840 m³ | |
prestressing steel | 110 t | |
reinforcing steel | 850 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20048929 - Published on:
03/11/2009 - Last updated on:
05/02/2016