General Information
Official designation: | A92 BW 55-2 (7438766 1/2) |
---|---|
Beginning of works: | 1979 |
Completion: | 1 January 1982 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Altdorf, Landshut (Kreis), Bavaria, Germany |
---|---|
Carries: |
A 92 Motorway (Germany)
|
Coordinates: | 48° 33' 24.88" N 12° 4' 35.11" E |
Technical Information
Dimensions
main span | 40.00 m | |
total length | 141.5 m | |
span lengths | 30.75 m - 2 x 40.00 m - 30.75 m | |
number of spans | 4 | |
deck | deck width | 2 x 14.75 m |
girder depth | 2.50 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Initial construction (1979-1982)
Owner
Client
Design
Structural engineering
Checking engineering
- Karl Heinisch (checking engineer)
Contractor
Prestressing
Strengthening (2015)
Design
Structural engineering
Checking engineering
-
Fritsche Ingenieure GbR
- Thomas Fritsche (checking engineer)
Contractor
Prestressing
Recalculation to current codes (2012-2013)
Client
Structural engineering
Checking engineering
-
Fritsche Ingenieure GbR
- Thomas Fritsche (checking engineer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20065556 - Published on:
31/07/2013 - Last updated on:
12/04/2016