General Information
Name in local language: | 臺北捷運 (Táiběi Jiéyùn) |
---|---|
Other name(s): | Taipei Mass Rapid Transit (MRT) |
Completion: | 28 March 1996 |
Status: | in use |
Project Type
Function / usage: |
Metro or rapid transit system |
---|
Location
km | Name |
Technical Information
Dimensions
horizontal radius of curvature | min. 200 m | |
number of tracks | 2 | |
number of stations | 131 | |
system length | 152.9 km | |
track gauge | 1 435 mm |
Design Loads
design speed | 80 km/h |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Characterising the failure pattern of a station box of Taipei Rapid Transit System (TRTS) and its rehabilitation. In: Tunnelling and Underground Space Technology, v. 32 (November 2012), pp. 260-272. (2012):
- Contractor Selection Process for Taipei Mass Rapid Transit System. In: Journal of Management in Engineering (ASCE), v. 14, n. 3 (May 1998), pp. 57-65. (1998):
- Function and Aesthetics of the new Taipei Transit System. Presented at: IABSE Symposium: Metropolitan Habitats and Infrastructure, Shanghai, China, 22-24 September 2004, pp. 132-133. (2004):
- (2009): An Investigation on the Performance of the Sealing Gaskets Used in Shielded Tunnels in Taipei MRT Projects. Presented at: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, pp. 138-145.
- Repair of displaced shield tunnel of the Taipei rapid transit system. In: Tunnelling and Underground Space Technology, v. 16, n. 3 (July 2001), pp. 167-173. (2001):
- About this
data sheet - Structure-ID
20084277 - Published on:
12/01/2023 - Last updated on:
24/01/2023