0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Talbrücke Sülte
Beginning of works: 1995
Completion: 1997
Status: in use

Project Type

Location

Location: , , ,
Carries:
  • Autobahn A46
Part of:
Coordinates: 51° 22' 58.08" N    8° 7' 57" E
Show coordinates on a map

Technical Information

Dimensions

total length 653.13 m / 617.18 m
bridge surface 17 653 m²
deck deck width 28.50 m
pier 11 height 54.62 m / 54.92 m

Cost

cost of construction German Mark 31 600 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Chronology

March 1995
— August 1997

Construction period.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000759
  • Published on:
    01/06/2000
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine