0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Stubenrauchbrücke
Beginning of works: 1961
Completion: 1964
Status: in use

Project Type

Structure: Box girder bridge
Material: Prestressed concrete bridge
Support conditions: Structurae Plus/Pro - Subscribe Now!
Plan view: Structurae Plus/Pro - Subscribe Now!
Support conditions:
Function / usage: upper deck:
Road bridge
lower deck:
Tramway, light or metro rail bridge

Location

Location: , , ,
Address: Tempelhofer Damm / Mariendorfer Damm (B96)
Crosses:
  • Teltowkanal
Part of:
Supports: Ullsteinstraße Metro Station (1966)
Connects to: Stubenrauch Bridge (West) (1964)
Coordinates: 52° 27' 13.41" N    13° 23' 3.51" E
Show coordinates on a map

Technical Information

Dimensions

total length 60 m
span 39 m
vertical navigation clearance 4.60 m

Materials

deck prestressed concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20010310
  • Published on:
    19/09/2003
  • Last updated on:
    28/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine