0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1895
Completion: 19 December 1899
Status: submerged

Project Type

Function / usage: Metro tunnel / subway tunnel
Construction method: Tunnel shield
Structure: Tunnel

Location

Location: , , ,
, , ,
Underneath of:
  • Spree River
Coordinates: 52° 29' 26.39" N    13° 28' 49.48" E
Coordinates: 52° 29' 16.83" N    13° 28' 34.57" E
Show coordinates on a map

Technical Information

Dimensions

width 3.76 m
total length 582 m
tunnel length 454 m

Participants

Design

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20066410
  • Published on:
    07/09/2014
  • Last updated on:
    07/09/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine