Beginning of works: 2005
Completion: November 2006
Duration of works: 19 months
Status: in use

Project Type

Location

Location: , ,
See also: Stephanitor Bridge (Rail) (2006)
Coordinates: 53° 4' 57.84" N    8° 47' 34.18" E
Show coordinates on a map

Technical Information

Dimensions

total length 44.98 m
span lengths 10.42 m - 24.14 m - 10.42 m
deck width 9.50 m
number of spans 3
bridge surface 465 m²

Quantities

structural steel 34 t
concrete volume 604 m³
reinforcing steel 107 t

Cost

cost of construction Euro 1 600 000

Materials

deck slab reinforced concrete
girders steel

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20060639
  • Published on:
    14/07/2011
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine