General Information

Beginning of works: 2008
Completion: 2009
Duration of works: 15 months
Status: in use

Project Type

Function / usage: Road bridge
Structure: Single-cell box girder bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , , ,
Address: B 303
Coordinates: 50° 12' 51" N    11° 13' 15" E
Show coordinates on a map

Technical Information

Dimensions

total length 229.00 m
span lengths 42.50 m - 3 x 48.00 m - 42.50 m
deck width 11.50 m
number of spans 5
horizontal radius of curvature 330 m
bridge surface 2 634 m²

Quantities

piles concrete volume 1 250 m³
reinforcing steel 85 t
substructure concrete volume 1 270 m³
reinforcing steel 180 t
superstructure concrete volume 1 875 m³
prestressing steel 86 t
reinforcing steel 350 t

Cost

cost of construction ca. Euro 4 500 000

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20060642
  • Published on:
    14/07/2011
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine