0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: September 2004
Completion: September 2006
Status: completed

Project Type

Location

Location: , ,
, ,
Address: A9
Part of:
Coordinates: 46° 16' 40.49" N    7° 52' 56.64" E
Show coordinates on a map

Technical Information

Dimensions

width 12.55 m
longitudinal slope 1.5 %
superelevation 3.0 %
deck deck depth 2.20 m
piers dimensions at base 3.0 m x 1.0 m
Northern bridge
length 213 m
Southern bridge
length 213 m

Cost

cost of construction Swiss Franc 12 500 000

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20080239
  • Published on:
    20/10/2020
  • Last updated on:
    20/10/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine