General Information
Status: | under construction |
---|
Project Type
Support conditions: |
for registered users |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
Longitudinal launching |
Structure: |
main bridge: Three-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Serb Republic, Bosnia and Herzegovina Sremska Mitrovica, Srem , Serbia |
---|---|
Crosses: |
|
Coordinates: | 44° 54' 34.71" N 19° 17' 52.41" E |
Technical Information
Dimensions
total length | 1 321 m | |
total width | 31.50 m | |
roadway / carriageway width | 2 x 11.50 m | |
abutments | number | 2 |
main bridge | ||
---|---|---|
total length | 330 m | |
span lengths | 90 m - 150 m - 90 m | |
deck width | 2 x 14.75 m | |
deck | deck depth | 5.00 m |
Quantities
structural steel | 5 500 t |
Materials
piers |
reinforced concrete
|
---|---|
deck of main bridge |
steel
|
abutments |
reinforced concrete
|
Participants
Launching
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2023): Highway Bridge over the Sava River at Sremska Raca – Construction. Presented at: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, pp. 521-528.
- About this
data sheet - Structure-ID
20086715 - Published on:
30/08/2023 - Last updated on:
30/08/2023