0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Brücke über den Spaniertalgraben
Official designation: BW 4
Beginning of works: 2013
Completion: 2015
Status: in use

Project Type

Location

Location: , , ,
Address: S289 / Mannichswalder Straße
Coordinates: 50° 47' 20" N    12° 21' 49.79" E
Show coordinates on a map

Technical Information

Dimensions

total length 322.00 m
span lengths 41.00 m - 5 x 48.00 m - 41.00 m
number of spans 7
bridge surface 3 736 m²
deck deck depth 2.40 m
deck width 11.60 m
piles diameter 0.90 m
length 10.50 - 17.00 m

Quantities

concrete volume 5 450 m³
prestressing steel 100 t
reinforcing steel 670 t
piles total length of piles 1026 m

Design Loads

design code(s) DIN-Fachbericht 101

Cost

cost of construction ca. Euro 3 750 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2016): Chronik des Brückenbaus. In: Curbach, Manfred (2016): 26. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 283-310.
  • About this
    data sheet
  • Structure-ID
    20074933
  • Published on:
    22/03/2018
  • Last updated on:
    22/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine