0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Smokestack of the Neudorf-Werndorf Thermal Power Plant

General Information

Completion: 1968
Status: demolished (July 2017)

Project Type

Location

Location: , ,
Coordinates: 46° 54' 30" N    15° 28' 58" E
Show coordinates on a map

Technical Information

Dimensions

height 175 m

Materials

shaft steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20058184
  • Published on:
    07/09/2010
  • Last updated on:
    21/11/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine