General Information
Project Type
Structure: |
Twin girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge |
Location
Location: |
Sinzing, Regensburg (Kreis), Bavaria, Germany |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 48° 59' 56.35" N 12° 2' 25.72" E |
Technical Information
Dimensions
total length | ca. 930 m | |
number of spans | 9 |
Materials
deck |
steel
|
---|
Case Studies and Applied Products
ROBO®CONTROL Permanent – Remote Monitoring System
Robo®Control detects the absence of machine specifications at the component and conveys these to a central computer. There the data are processed and they are made available to the clients through internet.
[more]Participants
Initial construction (1961-1966)
Owner
Client
Construction supervision
Repair & Widening
Steel construction
Bearings
Expansion joints
Monitoring (2007)
Remote monitoring system
Relevant Web Sites
Relevant Publications
- Gründung von Donaubrücken im bayerischen Raum. Presented at: 3. Internationale Donaubrückenkonferenz, 3rd International Conference on Bridges across the Danube, 29-30/10/1998, Regensburg, Germany, pp. 187-202. (1998):
- About this
data sheet - Structure-ID
20003734 - Published on:
20/06/2002 - Last updated on:
06/03/2022