General Information
| Name in local language: | Ahrbrücke Sinzig |
|---|---|
| Beginning of works: | 6 December 2021 |
| Completion: | 16 September 2022 |
| Status: | in use |
Project Type
| Structure: |
Haunched girder bridge Box girder bridge Three-span continuous girder bridge |
|---|---|
| Function / usage: |
Road bridge |
| Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
| Support conditions: |
for registered users |
| Deck levels: |
Structurae Plus/Pro - Subscribe Now! |
Location
| Location: |
Sinzig, Ahrweiler (Kreis), Rhineland-Palatinate, Germany |
|---|---|
| Crosses: |
|
| Coordinates: | 50° 33' 7.77" N 7° 15' 12.70" E |
Technical Information
Dimensions
| total length | 100.90 m | |
| span lengths | 31.06 m - 38.80 m - 31.04 m | |
| bridge surface | 1 014 m² | |
| number of lanes | 2 | |
| roadway / carriageway width | 7.50 m | |
| deck | deck width | 10.05 m |
| number of cells | 4 | |
| number of longitudinal girders | 4 |
Quantities
| deck | structural steel | 224 t |
| concrete volume | 410 m³ | |
| reinforcing steel | 140 t | |
| substructure | concrete volume | 1 022 m³ |
| reinforcing steel | 69 t |
Design Loads
| live load | LM 1 | |
| design code(s) | DIN EN 1991-2 + NA |
Cost
| cost of construction | Euro 7 200 000 |
Materials
| piers |
reinforced concrete
(C 30/37)
|
|---|---|
| deck slab |
reinforced concrete
(C 35/45)
precast reinforced concrete (C 50/60) |
| abutments |
reinforced concrete
(C 30/37)
|
| girders |
steel
(S 355)
|
Participants
Owner
Client
Design
Structural engineering
Soil investigation report
Checking engineering
- Wolfgang Kurz (checking engineer)
Contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- About this
data sheet - Structure-ID
20088618 - Published on:
31/05/2024 - Last updated on:
31/05/2024