General Information
Project Type
Function / usage: |
Railroad (railway) tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Brig-Glis, Valais, Switzerland Iselle, Trasquera, Verbano-Cusio-Ossola, Piedmont, Italy |
---|---|
Part of: | |
Next to: |
Simplon Tunnel (1922)
|
Coordinates: | 46° 19' 28" N 8° 0' 26" E |
Coordinates: | 46° 12' 27" N 8° 12' 3" E |
Technical Information
Dimensions
total length | 19 803 m | |
depth | max. 2 135 m |
Chronology
25 January 1906 | First train passes through the tunnel. |
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- 100 Jahre Simplontunnel. In: Schweizer Eisenbahn-Revue, 5/2006. :
- 50 Jahre Simplontunnel. In: Schweizerische Bauzeitung (1947-1978), v. 74, n. 19 (12 May 1956).
- Der Bau des Simplon-Tunnels. In: Schweizerische Bauzeitung (1883-1946), v. 34, n. 15 (14 October 1899).
- Der Bau des Simplon-Tunnels. In: Schweizerische Bauzeitung (1883-1946), v. 34, n. 14 (7 October 1899).
- Die Bauarbeiten am Simplontunnel. In: Schweizerische Bauzeitung (1883-1946), v. 39, n. 13 (29 March 1902). (1902):
- About this
data sheet - Structure-ID
20004604 - Published on:
22/08/2002 - Last updated on:
28/05/2021