General Information
Completion: | 1973 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Subdivided Warren truss bridge Continuous truss bridge |
Material: |
Steel bridge |
Structure: |
Deck truss bridge Through truss bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Hiroshima, Hiroshima, Japan |
---|---|
Next to: |
Asahi Bridge (1960)
|
Coordinates: | 34° 23' 22.34" N 132° 25' 34.22" E |
Technical Information
Dimensions
total length | 287 m | |
span lengths | 91 m - 103 m - 91 m | |
number of spans | 3 | |
abutments | number | 2 |
lower deck | number of lanes | 2 |
roadway / carriageway width | 7.5 m | |
walkway width | 3.5 m | |
piers | number | 2 |
upper deck | number of lanes | 2 x 2 |
roadway / carriageway width | 2 x 8 m |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20067965 - Published on:
24/10/2015 - Last updated on:
19/12/2024