General Information
Completion: | 2000 |
---|---|
Status: | in use |
Project Type
Structure: |
Extradosed bridge |
---|---|
Material: |
Prestressed concrete bridge |
Function / usage: |
Motorway bridge / freeway bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 610 m | |
main spans (3x) | 140 m | |
span lengths | 94.0 m - 3 x 140.0 m - 94.0 m | |
number of spans | 5 | |
deck | deck depth | 3 - 6 m |
deck width | 22 - 29.1 m | |
pylons | pylon height (above deck) | 10 m |
pylon height (above ground) | 32.70 m | |
stay cables | stay anchor spacing | 3.5 m |
Materials
deck |
prestressed concrete
|
---|---|
pylons |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Design
Co-contractor
Cables
Stay cables
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Extradosed bridges in Japan. In: FIP Notes, n. 2 ( 1998), pp. 11-15. (1998):
- Japan's longest bridge built with "extradosed" DYWIDAG external tendons. The Shikari Bridge is part of the Obihiro Hiroo Expressway and spans over the Tokachi River in Hokkaido with a total length of 610 m. In: DSI Info, n. 10 ( 2001- 2002), pp. 9.
- Mit DYWIDAG Externer Vorspannung Japans längste »extradosed« Brücke vorgespannt. Die Shikari Brücke ist Teil des Obihiro Hiroo Expressway und überspannt mit 610 m Länge den Tokachi Fluss in Hokkaido. In: DSI Info, n. 10 ( 2001- 2002), pp. 9.
- Précontrainte DYWIDAG «en extrados». Le pont de Shikari fait partie du Obihiro Hiroo Expressway et franchit, avec une longueur de 610 m, le fleuve Tokachi à Hokkaido. In: DSI Info, n. 10 ( 2001- 2002), pp. 9.
- About this
data sheet - Structure-ID
20006541 - Published on:
06/11/2002 - Last updated on:
05/02/2016