General Information
Completion: | 2024 |
---|---|
Status: | under construction |
Project Type
Function / usage: |
Road tunnel |
---|---|
Construction method: |
Immersed tube method |
Structure: |
Immersed tube tunnel |
Location
Location: |
Shenzhen, Guangdong, China |
---|---|
Underneath of: |
|
Part of: | |
Coordinates: | 22° 35' 58.04" N 113° 48' 30.20" E |
Technical Information
Dimensions
width | 46 m | |
length | 5 250 m | |
number of tubes | 3 |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20085385 - Published on:
16/02/2023 - Last updated on:
16/02/2023