0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Shenzhen Bay Bridge
Beginning of works: 2003
Completion: 1 July 2007
Status: in use

Project Type

Location

Location: , ,
, ,
Coordinates: 22° 27' 15.28" N    113° 58' 21.27" E
Coordinates: 22° 29' 24.13" N    113° 56' 44.79" E
Show coordinates on a map

Technical Information

Dimensions

main span 210 m
total length 3.8 km
total length 4 770 m
number of lanes 2 x 3

Participants

Initial construction (2003-2007)
Design
Wind tunnel testing
Monitoring equipment
Pylon inspection (2008)
Inspection services

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20004892
  • Published on:
    08/09/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine