General Information
Other name(s): | Bridge No. 9 |
---|---|
Completion: | 2003 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
pylon: Steel-concrete hybrid bridge Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 168.5 m | |
total length | 240 m | |
number of cables | 102 | |
deck | deck width | 37.2 m |
pylon | pylon height | 85 m |
Quantities
prestressing steel | 250 t |
Materials
cables |
steel
|
---|---|
pylon |
reinforced concrete
|
Excerpt from Wikipedia
The Seri Wawasan Bridge is one of the main bridges in the planned city Putrajaya, the new (2001) Malaysian federal territory and administrative centre. This futuristic asymmetric cable-stayed bridge with a forward-inclined pylon has a sailing ship appearance, accented at night with changeable color lighting. The bridge, also called Bridge No. 9, crosses Putrajaya Lake, an artificial lake made to provide natural cooling, and connects Precinct 2 on the Core Island, where the main government buildings are located, to the residential area of Precinct 8, 9.
Structure
The Seri Wawasan Bridge is a longitudinally asymmetric cable‐stayed box-girder bridge with an inverted-Y shape concrete/steel pylon 96 metres (315 ft) high. The main span, 165 metres (541 ft) long, is supported by 30 pairs of forward stay cables, anchored on the 75° forward‐inclined pylon and on the outer edges of the bridge deck, arranged in a fan shape pattern from the side elevation. To counterbalance these front stays, a combination of 21 pairs of cable backstays and structural steel tie back was used. The back stay anchored at the (next-) highest point of the pylon is anchored at the curved backstay anchorage point (next-) nearest to the pylon, creating a crisscross‐over pattern from the side elevation, which adds to the aesthetic of the bridge. The overall complexity of the back stay tie back structure, however, may be aesthetically distracting. The inclined concrete pylon and the backstays are anchored into bore piled foundation off the roadway in precinct 8.
The bridge carries a dual three lane carriageways of 18.6 m width each, comprising 3 x 3.5 m width lanes, 0.5 m hard shoulder, 0.5 m marginal strip. The median is 4 m wide and walkway cum cycle track width is 5.1 m giving a total width of 37.2 metres (122 ft) at the centre of the bridge.
Text imported from Wikipedia article "Seri Wawasan Bridge" and modified on June 12, 2021 according to the CC-BY-SA 4.0 International license.
Participants
Relevant Web Sites
Relevant Publications
- Des haubans pour Putrajaya. In: Freyssinet Magazine, n. 214 (May - August 2002), pp. 19.
- Freyssinet cable-stayed structures. Freyssinet International, Vélizy-Villacoublay (France), 2004, pp. 62.
- About this
data sheet - Structure-ID
20001559 - Published on:
28/07/2001 - Last updated on:
31/10/2022