General Information
Name in local language: | Seogang Daegyo (서강대교) |
---|---|
Beginning of works: | 7 June 1980 |
Completion: | October 1998 |
Status: | in use |
Project Type
Structure: |
Network arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Seoul, South Korea |
---|---|
Crosses: |
|
Coordinates: | 37° 32' 18.05" N 126° 55' 33.73" E |
Technical Information
Dimensions
total length | 1 320 m | |
arch span | 150 m | |
deck | width | 29.0 m |
Materials
arch |
steel
|
---|
Case Studies and Applied Products
TENSA®GRIP RS & RS-LS – Single gap joints
The RS Expansion Joint is designed for highly loaded bridges with heavy traffic. In normal situations it allows movements up to 80 mm. The Single Gap Joint RS type construction consists of two heavy steel edge profiles with anchor brack ... [more]
TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Design
Structural engineering
Contractor
Subcontractor
Expansion joints
Relevant Web Sites
Relevant Publications
- Freyssinet cable-stayed structures. Freyssinet International, Vélizy-Villacoublay (France), 2004, pp. 34.
- About this
data sheet - Structure-ID
20006568 - Published on:
06/11/2002 - Last updated on:
06/02/2023