General Information
Completion: | 2002 |
---|---|
Status: | in use |
Project Type
Structure: |
Triple T-section girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Prestressed concrete bridge |
Location
Location: |
Nonsan, South Chungcheong, South Korea |
---|
Technical Information
Dimensions
total length | 2 x 120 m | |
span lengths | 3 x 40 m | |
number of spans | 3 | |
horizontal radius of curvature | 3 993.923 m / 4 007.877 m | |
deck | deck width | 12.145 m (2 x T) 15.750 m (3 × T) |
Quantities
prestressing steel | 100 t |
Materials
deck |
prestressed concrete
|
---|---|
deck slab |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20010757 - Published on:
28/11/2003 - Last updated on:
05/02/2016