• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Share

Follow

Sellwood Bridge

General Information

Completion: 29 February 2016
Status: in use

Project Type

Structure: Deck arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Crosses:
  • Willamette River
Replaces: Sellwood Bridge (1925)
Coordinates: 45° 27' 50.61" N    122° 39' 56.74" W
Show coordinates on a map

Technical Information

Dimensions

main span 142 m
width 20 m
total length 602 m

Cost

cost of construction ca. United States dollar 290 000 000

Materials

arches steel

Advertisement

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20066362
  • Date created
    13/08/2014
  • Last Update
    05/02/2019