General Information
Other name(s): | Tacoma Street Bridge |
---|---|
Completion: | 25 December 1925 |
Status: | out of service |
Project Type
Structure: |
Deck truss bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Baltimore truss bridge |
Material: |
Steel bridge |
Location
Location: |
Portland, Multnomah County, Oregon, USA |
---|---|
Address: | Tacoma Street |
Crosses: |
|
Replaced by: |
Sellwood Bridge (2016)
|
Coordinates: | 45° 27' 52.04" N 122° 39' 57.02" W |
Technical Information
Dimensions
main span | 91.44 m | |
total length | 601.13 m | |
deck width | 7.32 m |
Materials
truss |
steel
|
---|
Chronology
15 December 1925 | Opening. |
---|
Participants
Design
- Gustav Lindenthal (chief engineer)
- Ira G. Hedrick (design engineer)
Contractor
Resident engineering
- Hans H. Rode (resident engineer)
Relevant Web Sites
- About this
data sheet - Structure-ID
20005469 - Published on:
24/09/2002 - Last updated on:
31/03/2020