General Information
Name in local language: | Pont Seibert |
---|---|
Beginning of works: | May 2020 |
Completion: | 2022 |
Status: | under construction |
Project Type
Material: |
Steel bridge |
---|---|
Structure: |
Axial (single) tied-arch bridge |
Function / usage: |
Road bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Boulogne-Billancourt, Hauts-de-Seine (92), Ile-de-France, France Meudon, Hauts-de-Seine (92), Ile-de-France, France |
---|---|
Crosses: |
|
Coordinates: | 48° 49' 18.08" N 2° 14' 7.23" E |
Technical Information
Dimensions
main span | 100 m | |
total length | 150 m |
Cost
construction cost (without tax) | Euro 41 500 000 |
Materials
deck |
steel
|
---|---|
arches |
steel
|
Participants
Architecture
Structural engineering
Co-contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20082903 - Published on:
22/05/2022 - Last updated on:
22/05/2022