General Information
Completion: | 21 May 2010 |
---|---|
Status: | in use |
Project Type
Structure: |
Two-span single-pylon cable-stayed bridge |
---|---|
Support conditions: |
for registered users |
Material: |
Steel bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: Motorway bridge / freeway bridge lower deck: Tramway, light or metro rail bridge |
Location
Technical Information
Dimensions
width | 18 m | |
total length | 5 800 m | |
main bridge | ||
---|---|---|
main span | 251.4 m | |
total length | 436.55 m |
Materials
pylon |
reinforced concrete
|
---|---|
piers |
reinforced concrete
|
deck truss |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20085868 - Published on:
16/05/2023 - Last updated on:
16/05/2023