0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: October 2013
Completion: 31 July 2017
Status: in use

Project Type

Function / usage: Road bridge
Support conditions:
Structure: main bridge:
Truss arch bridge
main bridge:
Tied-arch bridge with inclined hangers
Material: main bridge:
Steel bridge
Structurae Plus/Pro - Subscribe Now!

Location

Location: , , ,
Crosses:
  • Volga River
Next to: Borsky Road Bridge (1965)
Coordinates: 56° 21' 11.13" N    43° 55' 29.62" E
Show coordinates on a map

Technical Information

Dimensions

main span 161 m
total length 1 450.9 m

Materials

piers reinforced concrete
arches steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20079966
  • Published on:
    01/09/2020
  • Last updated on:
    22/01/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine