0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1965
Status: in use

Project Type

Structure: Through truss bridge
Material: main bridge:
Steel bridge
Structurae Plus/Pro - Subscribe Now!
Structure: approach viaduct:
Deck arch bridge
Material: approach viaduct:
Reinforced concrete bridge
Function / usage: upper deck:
Road bridge
lower deck:
Railroad (railway) bridge

Location

Location: , , ,
Crosses:
  • Volga River
Next to: Borsky Railroad Bridge (1935)
Second Borsky Road Bridge (2017)
Coordinates: 56° 21' 12" N    43° 55' 27" E
Show coordinates on a map

Technical Information

Dimensions

length 1 608 m

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20037109
  • Published on:
    14/05/2008
  • Last updated on:
    01/09/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine