Structures & Large-Scale Projects
-
Vomp-Terfens Rail Tunnel (2010)
Terfens, Tyrol, Austria - Vomp, Tyrol, Austria
Drilling and blasting
New Austrian Tunnelling Method (NATM)
Railroad (railway) tunnel
Tunnel
-
Vulpera Tarasp Inn Bridge (2010)
Scuol, Grisons, Switzerland - Tarasp, Grisons, Switzerland
Box girder bridge
Road bridge
Prestressed concrete bridge
Haunched girder bridge
-
Vulpera/Tarasp Bridge (2010)
Tarasp, Grisons, Switzerland
Haunched girder bridge
Prestressed concrete bridge
Balanced cantilever method
Road bridge
-
Waitan Bridge (2010)
Ningbo, Zhejiang, China
Two-span cable-stayed bridge
Cable-stayed bridge with semi-fan system
Road bridge
-
Wakota Bridge (2010)
South Saint Paul, Minnesota, USA - Newport, Minnesota, USA
Haunched girder bridge
Prestressed concrete bridge
Box girder bridge
Road bridge
Balanced cantilever method
-
Wasserkraftwerk Keselstraße (2010)
Kempten (Allgäu), Bavaria, Germany
Hydroelectric dam / plant
Concrete dam
-
Waterkant Footbridge (2010)
Cape Town, Western Cape, South Africa
Pedestrian bridge (footbridge)
Steel-reinforced concrete composite bridge
Cable-stayed bridge with fan system
-
Wenzhou World Trade Center (2010)
Wenzhou, Zhejiang, China
Office building
-
Wildbrücke Völkermarkt (2010)
Völkermarkt, Carinthia, Austria
Fiber-reinforced concrete bridge
Cantilever construction using temporary stays in vertical position, then rotation into horizontal
Road bridge
Arch bridge
-
Willis Avenue Bridge (2010)
New York, New York, USA
Swing bridge
Road bridge
Non-parallel chord truss bridge
Through truss bridge
Steel bridge
-
Wind Tower 1 (2010)
Dubai, Dubai, United Arab Emirates
Apartment building
Office building
-
Wind Tower 2 (2010)
Dubai, Dubai, United Arab Emirates
Apartment building
Office building