General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Double T-section girder bridge Two-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Homburg, Saarpfalz-Kreis, Saar, Germany |
---|---|
Part of: | |
Coordinates: | 49° 15' 51.14" N 7° 18' 51.40" E |
Technical Information
Dimensions
width | 31.60 m | |
deck depth | 2.20 m | |
total length | 76.14 m | |
span lengths | 32.24 m - 43.90 m | |
number of spans | 2 | |
bridge surface | 2 410 m² | |
piles | diameter | 1.20 m |
length | ca. 10 m |
Quantities
concrete volume | 5 450 m³ | |
prestressing steel | 89 t | |
reinforcing steel | 690 t |
Cost
cost of construction | ca. Euro 7 300 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. In: (2018): 28. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 215-230. (2018):
- About this
data sheet - Structure-ID
20074897 - Published on:
19/03/2018 - Last updated on:
19/03/2018